Weekly Reports
Team reports which cover each subsystems progress done from the two weekly meetings.
This mission is actively happening this Fall 25' with more information to be published soon.
Week 1 (9/16/2025 & 9/18/2025)
9/16/2025 Meeting
The Tethered-Sat 2A team held its first project meeting to discuss deployment mechanisms for the satellite. The group initially considered using a drone system, either mounted on the side or bottom of the satellite and released through a servo-activated trapdoor, with a potential housing size of 2U to accommodate the design. After discussion, the team decided to move forward with a guided parafoil deployment system. Unlike a passive parachute, this system will incorporate mechanisms to create controlled swaying, enabling remote steering during descent.
Cameras and altitude sensors will be included, along with a spring-loaded parafoil release system, though the exact deployment method is still under consideration.
To organize the project, four subsystem teams were established: Communications, focusing on aviation and camera integration; Mechanical, covering motors, servos, and CAD design; Guided Parafoil, responsible for motorized control of the parafoil; and a separation system team, tasked with developing a scissor-like snipping mechanism mounted separately from the 2U satellite but attached to the balloon, ensuring the satellite functions independently once released.
Last updated