T-Sat-1 took flight from the UCF Arboretum on the morning of June 21st, 2025. The burnwire mechanism worked correctly allowing the parachute to deploy successfully and at the correct altitude.

## Flight 1

The flight of T-Sat-1 began around 9:30 AM and reached a max altitude of roughly 125m (410ft).

<figure><img src="/files/Uiscsrd2niHEkb37tcDp" alt=""><figcaption><p>Figure 1: Altitude graph for flight 1 of T-Sat-1. Measured in m.</p></figcaption></figure>

<figure><img src="/files/zUaLgQ4bjeNb2bZnUs9F" alt=""><figcaption><p>Figure 2: Temperature graph for flight 1 of T-Sat-1. Measured in °C.</p></figcaption></figure>

<figure><img src="/files/cx9e5vCHR2I9rTHUKQ2o" alt=""><figcaption><p>Figure 3: Temperature vs. Altitude graph for flight 1 of T-Sat-1. Temperature measure in °C. Altitude measured in m.</p></figcaption></figure>

<figure><img src="/files/QUHy7fPygFdxlfYn4NPv" alt=""><figcaption><p>Figure 4: Ascent velocity graph for flight 1 of T-Sat-1. Measured in m/s.</p></figcaption></figure>

{% embed url="<https://youtube.com/shorts/0dhaW7U11Pk?feature=share>" fullWidth="true" %}
Video from the ground as the burnwire radio signal was sent and then received by the burnwire.
{% endembed %}

Due to T-Sat-1 getting caught in a tree at the arboretum we were limited to a single flight. We were able to recover T-Sat a day later when one of our members climbed the tree and untangled the parachute.

{% embed url="<https://youtu.be/qYbWAhrjxgA>" %}
Pictures captured from T-Sat-1 flight.
{% endembed %}

{% embed url="<https://youtu.be/Q97COd__YNQ>" %}
Pictures captured the day after launch while T-Sat-1 was stuck in a tree during a thunderstorm.